Cost of downtime: what an hour costs a packaging line
Surveys put an hour of downtime at $36,000 to $2.3 million, and neither is your line. How to work out what an hour really costs you, with a packaging line example.

You ask for money for a spare servo drive, a second technician on nights or a better sensor on the filler, and the controller asks the obvious question: what does an hour of downtime on that line actually cost? Usually the only number anyone has is a survey figure for a whole industry, and nobody in the room believes it applies to them.
The cost of downtime is the money a plant loses for every hour a machine or line stands still: lost production margin, idle labor, repair costs, scrap and knock-on costs such as missed deliveries. Industry surveys put an hour of downtime at $36,000 in consumer goods and about $85,000 in food and beverage.
Those numbers describe whole plants. The number that decides how much you can sensibly spend on preventing downtime is the cost of an hour on your own line, and you can work it out in half an hour with the steps below.
Average cost of downtime in manufacturing
Two survey series get quoted most often, so it’s worth knowing what they say before one of them ends up on your slide.
Siemens’ report The True Cost of Downtime 2024 puts a lost hour at $36,000 in fast-moving consumer goods, the lowest of the sectors it covers, and at $2.3 million in automotive. Consumer goods was the only sector where downtime hours went up, and the yearly cost of downtime per consumer goods plant doubled to just over $10 million. An average large plant in the survey had 25 downtime incidents and 27 hours of unplanned downtime a month (Siemens, 2024).
ABB’s Value of Reliability survey of 3,215 companies found a median cost of $124,669 per hour of unplanned downtime across industries, and $84,681 in food and beverage. 69% of respondents had unplanned outages at least once a month (ABB, 2023). In ABB’s 2025 follow-up with 3,600 respondents, most put the cost somewhere between $10,000 and $500,000 an hour (World Pipelines).
Cost of downtime by industry
- Automotive: $2.3 million per hour (Siemens, 2024)
- Food and beverage: $84,681 per hour (ABB, 2023)
- Fast-moving consumer goods: $36,000 per hour (Siemens, 2024)
- All industries, median: $124,669 per hour (ABB, 2023)
These are estimates for whole plants or companies, including knock-on effects that a single line may not have.
-
Automotive$2.3 million
-
All industries, median$124,669
-
Food and beverage$84,681
-
Fast-moving consumer goods$36,000
-
One cartoning line, sold out€2,750
The surveys describe whole plants and companies (Siemens, 2024; ABB, 2023). The cartoning line is the worked example further down this article. Its figure is in euros, converted for the dots at €1 = $1.14.
Why your cost of downtime per hour is different
Three things decide what an hour of downtime costs on one particular line:
- Whether you can make up the lost output. If the plant has spare capacity, a lost hour costs the overtime to catch up. If the line is the bottleneck and sold out, the margin on everything it would have made is gone.
- Whether the line stops others. A filler that stops also stops the labeler, the case packer and the palletizer behind it.
- What the customer contract says. Missed delivery windows, penalties and expedited freight can cost more than the production itself.
How to calculate the cost of downtime
For one hour of unplanned downtime on one line, add up:
- Lost contribution margin. If the output is lost, multiply the units per hour by the contribution margin per unit, which is the selling price minus the variable cost. Use margin, never revenue: when the line stops, the plant also stops using material.
- Or the recovery cost. If the output can be made up later, use the cost of overtime for the crew, extra energy and supervision instead.
- Idle labor. The operators who are paid while the line stands.
- Maintenance. Technician hours, external service and parts.
- Knock-on costs. Stopped lines upstream and downstream, missed trucks, penalties and quality holds.
- Then multiply by the hours lost. Downtime hours are the number of stops multiplied by the mean time to repair.
- Then add scrap and restart losses for every stop. Material thrown away when the line stops and while it gets back to speed. This is a cost per stop, not per hour, so many short stops can cost more than one long one.
Downtime cost formula
Cost of downtime per hour = lost margin (or recovery cost) + idle labor + maintenance + knock-on costs
Multiply the hourly figure by the hours of unplanned downtime in the period, then add the scrap and restart losses once for every stop.
Downtime cost calculator with a packaging line example
The numbers below are made up for illustration, so swap in your own as you go.
A cartoning line packs 7,200 packs an hour. The contribution margin is €0.35 a pack. Four operators cost €35 an hour each, fully loaded, and two technicians work on the stop at €45 an hour each. Every stop throws away about 300 packs of material at €0.15 each.
- If the line is sold out, an hour of downtime costs €2,520 in lost margin, €140 in idle labor and €90 in maintenance labor: about €2,750, plus €45 of scrap for each stop.
- If the plant can make up the output on an overtime shift, the same hour costs the €140 of idle labor, about €210 of overtime for the four operators at time and a half, and the €90 of maintenance labor: about €440, plus the scrap.
So the same stop costs about six times more on a sold-out line than on one with spare capacity. That’s why a single industry figure rarely fits your line.
Now multiply by the hours. If this line stops 10 times a month and each repair takes 90 minutes, it loses 15 hours, and the sold-out cost is about €41,700 a month including scrap. If repair time fell by 26%, as it did at Amcor Flexibles after it started using Edmund, and the number of stops stayed the same, the line would lose about 11 hours a month and save roughly €10,700.
Rates, scrap and other costs
One hour of downtime
the line would save €10,725 a month, or €128,700 a year, with the same number of stops.
* A simplified model. The real cost of downtime on your line takes more inputs than these, such as lines stopped upstream and downstream, contract penalties and quality holds.
And that’s your answer for the controller. On the sold-out line, a spare drive that saves a single four-hour stop is worth €11,000 before you even count the scrap.
For a whole plant instead of one line, the Edmund savings calculator works out what shorter repairs would save.
Cost of unplanned downtime vs planned downtime
Planned downtime for changeovers, cleaning and maintenance costs production time too, but you can schedule it around demand and staff it in advance. Unplanned downtime costs more per hour because it hits without warning: crews stand idle, orders slip and repairs happen in a hurry. It’s the price of running critical machines on reactive maintenance. The survey figures above are for unplanned downtime.
How to reduce the cost of downtime
You have two levers: fewer stops and shorter stops.
- Fewer stops. Predictive maintenance catches wear before it turns into a failure, and a root cause analysis keeps a fixed fault from coming back. Both show up as a higher MTBF.
- Shorter stops. A lower MTTR cuts the length of every stop. The main levers are faster diagnosis, clear alarms, spare parts on hand and documentation at the machine.
Our post on how AI reduces machine downtime covers where AI helps with both. Edmund works on the second lever: it finds the cause of a stop in the plant’s PLC programs, drawings, manuals and maintenance journals while the line is down. If you’d like to see what that does to your own numbers, send us a fault that cost you a shift.
Frequently asked questions
How much does downtime cost per hour?
It depends on the industry and the line. Surveys report $36,000 an hour in consumer goods, $84,681 in food and beverage and $2.3 million in automotive. A single packaging line often costs a few thousand euros an hour in lost margin and labor.
How do you calculate the cost of downtime in manufacturing?
Add the lost contribution margin (or the cost of making up the output), idle labor, maintenance and knock-on costs for one hour on one line, and multiply that by the hours of unplanned downtime. Then add the scrap and restart losses once for every stop.
What is the true cost of downtime?
The True Cost of Downtime is the title of Siemens’ downtime report. Its 2024 edition estimates that the world’s 500 largest companies lose 11% of their revenue, about $1.4 trillion a year, to unplanned downtime.
What is the hidden cost of downtime?
The costs that don’t show up in the maintenance budget: missed deliveries, penalties, expedited freight, quality holds, overtime to catch up, and the lines upstream and downstream that stop too.
What is downtime in manufacturing?
Any period when a machine or line that should be producing isn’t. Unplanned downtime comes from breakdowns and faults. Planned downtime covers changeovers, cleaning and scheduled maintenance.