26 October 2026 10 min read

Root cause analysis for machine breakdowns, with examples

The same fault keeps coming back after every repair. How to find out why: the steps, the methods (5 Whys, fishbone, fault tree), a worked example and a template.

The case packer stops with a product jam alarm for the third time this week. The technician clears the infeed, cleans the photo sensor, and the line runs again. The ticket says “sensor cleaned, OK”. Next Tuesday, after the changeover to the small carton, it jams again.

Each of those repairs got the line running, and none of them asked why the jams kept coming back. Anyone who has worked a few night shifts knows a machine like that. Finding out why is the job of a root cause analysis.

Root cause analysis (RCA) in maintenance is a structured way to find out why a machine broke down, so the fix keeps the failure from coming back. It follows the failure from the symptom to the underlying cause, using evidence from the machine, its program, its wiring and its history, and it ends with a corrective action.

What is root cause analysis in maintenance?

Root cause analysis is a collective name for methods that uncover the causes of a problem (ASQ). In maintenance, the problem is an equipment failure or a machine breakdown, and the goal is a fix that stops it from happening again. It looks back at what already happened, and it’s not a tool for finding someone to blame. Root cause failure analysis (RCFA) applies the same logic to one failed component and goes down to the failure mechanism, such as wear, fatigue, corrosion or overload.

ASQ’s model of a team analysis runs for about two months of weekly meetings. That’s fine for a quality problem and far too slow for a line that’s down now. So you need two speeds: a short analysis for most breakdowns, and a full one for the serious cases.

When to do a root cause analysis on equipment failure

Not every stop needs one, and the middle of a stop is a bad time to decide. Set the triggers in advance and write them into the maintenance procedure, for example:

  • the same fault three times in 30 days on one machine
  • a stop longer than four hours
  • any safety or quality incident
  • a repair above a set cost

The case packer would have hit the first trigger by the end of its second week.

Root cause analysis steps

  1. Secure the evidence before the machine restarts.
  2. Define the problem: which machine, which symptom, when, and how often.
  3. Build the timeline: alarms, operator actions, process conditions and recent changes, in order.
  4. List the possible causes with a method that fits the failure (below).
  5. Verify the root cause with evidence: a test, a measurement, the PLC logic, the drawing or the fault history.
  6. Decide the corrective actions, with an owner and a date for each.
  7. Check that the fix held: count recurrences after 30, 60 and 90 days.

Secure the evidence before the restart

Once the machine runs again, most of the evidence is gone, and production will want it running as soon as possible. So before the restart, and only when it’s safe:

  • Save the alarm history and the controller’s diagnostic buffer or fault log, or photograph them.
  • Note the HMI screen and the step where the sequence stopped.
  • Photograph the failed part and its surroundings before anything gets cleaned, and keep the part.
  • Record the process conditions: speed, product, recipe, temperature.
  • List recent changes: program edits, parts replaced, settings adjusted, new material.
  • Write down what the operator and the technician saw, the same day. By next week, memories will have quietly rearranged themselves.
  • Pull earlier tickets and journal entries for the same machine and symptom.

Root cause analysis methods

5 Whys

Ask why the problem happened, then why that happened, until you reach a cause you can act on. ASQ credits the 5 Whys to Sakichi Toyoda (ASQ). It’s fast and suits a single clear chain of events. It also tends to follow one path and can end at an opinion, so every answer needs evidence behind it.

Fishbone (Ishikawa) diagram

A fishbone diagram sorts possible causes into categories such as people, machine, method, material, measurement and environment (ASQ). It suits failures where several factors combine, and it works well on a whiteboard with the team.

Fault tree analysis

Fault tree analysis starts from the failure and works down through AND and OR logic to the combinations of events that lead to it (IEC 61025). It suits complex or safety-relevant failures.

FMEA

Failure mode and effects analysis works forward: it lists how a machine can fail and ranks the failure modes (ASQ). Update it after every root cause analysis, so your preventive maintenance plan covers what you learned.

8D problem solving

8D (eight disciplines) is a team method from the automotive industry. It puts containment before the root cause step and prevention of recurrence after it, which suits failures that reach the customer.

Root cause failure analysis (RCFA)

RCFA focuses on the failed component and how exactly it failed. R. Keith Mobley’s book Root Cause Failure Analysis (Butterworth-Heinemann, 1999) covers the method for maintenance teams.

Root cause analysis example: 5 Whys on a case packer breakdown

Back to the case packer. It’s an illustration, but most maintenance teams will recognize it: the machine stops with a “product jam” alarm about three times a week, most often after a format changeover.

  1. Why does the machine stop? The jam alarm is raised at the infeed. The alarm history shows it every time.
  2. Why is the jam alarm raised? The PLC program raises it when the infeed photoelectric sensor stays blocked for more than 300 ms during the pusher cycle. Cartons are arriving skewed and block the beam.
  3. Why do cartons arrive skewed? After changeovers to the smaller format, the side guides are set too wide. The changeover log shows the positions.
  4. Why are they set too wide? The changeover sheet still lists guide positions for the old carton size.
  5. Why is the sheet out of date? The format parts were replaced last year and nobody updated the sheet.

The root cause is document control for changeover settings. The corrective actions are an updated sheet, marks on the guides for each format and a check in the changeover procedure. To check that the fix held, count jam stops after changeovers for the next 60 days.

Without evidence at each step, the same analysis could have ended at “replace the sensor”, which is about where the tickets at the start ended, and the stops would have carried on.

5 Whys on a case packer that jams after changeovers
  1. Why does the machine stop?

    The jam alarm is raised at the infeed, every time.

    Checked in the alarm history

  2. Why is the jam alarm raised?

    The infeed sensor stays blocked for more than 300 ms in the pusher cycle, because cartons arrive skewed.

    Checked in the PLC program

  3. Why do cartons arrive skewed?

    After changeovers to the smaller format, the side guides are set too wide.

    Checked in the changeover log

  4. Why are they set too wide?

    The changeover sheet still lists guide positions for the old carton size.

    Checked in the changeover sheet

  5. Why is the sheet out of date?

    The format parts were replaced last year and nobody updated it.

  6. Root cause

    Document control for changeover settings

    Corrective actions
    Update the sheet, mark the guides for each format, and add a check to the changeover procedure.
    Check that it held
    Count jam stops after changeovers for the next 60 days.

Fishbone example for the same machine breakdown

Before the 5 Whys, the team could have listed candidate causes on a fishbone diagram:

  • Machine: dirty or misaligned sensor, worn pusher, drive speed drift
  • Method: changeover procedure, guide settings, jam timeout in the program
  • Material: carton board stiffness, carton dimensions from a new supplier
  • People: changeover done by a new operator, settings not checked
  • Measurement: no marks on the guides, no check after changeover
  • Environment: humidity changing carton stiffness

The evidence then rules the candidates in or out. Here the changeover log and the alarm history point to the method branch.

Fishbone diagram for the same breakdown

Machine

  • Dirty or misaligned sensor
  • Worn pusher
  • Drive speed drift

Method

  • Changeover procedure
  • Guide settings
  • Jam timeout in the program

Material

  • Carton board stiffness
  • Carton dimensions from a new supplier

Case packer jams after changeovers

  • Changeover done by a new operator
  • Settings not checked

People

  • No marks on the guides
  • No check after changeover

Measurement

  • Humidity changing carton stiffness

Environment

The changeover log and the alarm history point to the method branch.

Root cause analysis template for maintenance

Copy these fields into your CMMS, a form or a spreadsheet:

  1. Machine and line, asset number
  2. Date and time of the failure, and who reported it
  3. Symptom and alarm: alarm text, code, HMI screen
  4. Downtime: start, end, total minutes
  5. Evidence collected: diagnostic buffer, photos, parts kept, process conditions
  6. Timeline of events before the failure
  7. Recent changes: program, parts, settings, material
  8. Possible causes by fishbone category
  9. Root cause, with the evidence that confirms it
  10. Corrective actions, each with an owner and a due date
  11. Verification: recurrences after 30, 60 and 90 days
  12. Updates made: preventive maintenance plan, FMEA, standard work

Root cause and corrective action

A root cause analysis is only finished when the corrective action is done and checked. Corrective actions fix the cause of this failure. Preventive actions change the maintenance plan, the procedure or the design so the same kind of failure doesn’t start somewhere else. Record both, and go through the open actions every week. This is what people mean by proactive maintenance, and our overview of the types of maintenance shows where it sits next to the others.

Why root cause analysis stalls on the shop floor

If root cause analysis rarely happens in your plant, you’re in good company. Researchers at Chalmers University studied four manufacturers and found the same obstacles in each: an analysis takes time, nobody’s sure when to start one, priorities depend on individual people, there’s very little data to support the work, and everyone’s busy fighting the next fire (International Journal of Quality and Reliability Management, 2022).

And the ticket that says “sensor cleaned, OK” is part of the problem. When the fix isn’t written down properly, the next analysis starts from zero, which is the story of why the plant forgets.

The World Economic Forum describes the same pattern at Foxconn Industrial Internet in Vietnam, where operators used to reset machines without knowing the root cause. The site reported that a tool listing the likely root causes and linking them to the machine handbooks cut unplanned downtime by 90% (WEF, 2025).

Root cause analysis software and AI

Most of the evidence a root cause analysis needs is already in your plant, spread across places that are hard to search during a busy week:

  • Earlier occurrences. Journals and tickets, searched by machine and symptom, show whether the fault happened before and what was done.
  • The logic behind the alarm. The PLC program shows which condition raised it, and the electrical drawings show which sensor, terminal and cable carry the signal. Our PLC troubleshooting guide walks through reading that logic at a stopped machine.
  • The fix. A short note on what was found and what fixed it, written where the next person will look.

Edmund reads the plant’s PLC programs, electrical drawings, manuals and maintenance journals and answers with the source for each finding. “Using Edmund has led to a lower frequency of a specific failure, or even its complete elimination,” says David Frajt, head of maintenance at Moravia Cans. For the wider picture, see how AI reduces machine downtime. And if you have a fault like the case packer’s, one that keeps coming back, send it to us.

Root cause analysis raises MTBF by removing repeat failures, and faster diagnosis lowers MTTR. Both cut the cost of downtime.

Frequently asked questions

What are the steps of a root cause analysis?

Secure the evidence, define the problem, build the timeline, list the possible causes, verify the root cause with evidence, decide corrective actions with owners and dates, and check that the fix held after 30, 60 and 90 days.

What is the difference between RCA and RCFA?

Root cause analysis (RCA) is the general term for finding the cause of any problem. Root cause failure analysis (RCFA) applies it to a failed component and goes down to the physical failure mechanism.

What is a 5 Whys example in manufacturing?

A case packer jams after changeovers. Why? The jam sensor is blocked. Why? Cartons arrive skewed. Why? The guides are set too wide. Why? The changeover sheet lists old settings. Why? Nobody updated it when the format parts were replaced.

How long should a root cause analysis take?

A short analysis of a common breakdown can be done in an hour with the evidence at hand. A full team analysis of a serious failure takes weeks. Set triggers so each failure gets the right one.

Who should take part in a root cause analysis?

The technician who did the repair, the operator who saw the failure, someone who knows the control system, and a maintenance lead who owns the corrective actions.